The road of Xinzhonggang
First phase
Start working: Sep 1985.
Totall investment: 11.5 millions yuan
Put into production: Dec 1986
Second phase
Total investment: 23.6 millions yuan
Start working: Dec 1990
Put into production: Apr 1992
It has adopt the advanced technic of circulating fluidized bed
inflammation, It is the first 75t/h double temperature separate
recycle in China which can generate Thermal Power. It is the emphases
economize on energy project. It is the demonstration of economize
on energy project which is listed by CAS, National planning commission,
SETC, National material department.
It has been awarded the technical progess of CAS and the technical
progess of Zhejiang.
Third phase
Total investment :62.3 millions yuan
Start working in Dec 1994
Put into production in Aug 1996
It has been listed as the demonstrative project of circulating fluidized bed by SIEC. We have three boilers and three machines. The generator
has a capacity of generating 28.5 thousands kw electricity and supplying
100t/h heat.
1998
Making advantage of circulating fluidized bed boiler, reconstructing
flying ash system and adopting frequency conversion and timing technic
in the high-power generator, The energy consume has been reduce
a lot to 315g/kw.h..
Now our total Thermal Power has exceed 59%. The rating of Thermal
Power has advanced to 253% which is much higher than the standard
regulated by Four national departments (the rating of thermal efficiency
is 45% ;the rating of Thermal Power is 100%).
|